分享

石子河市MedAccred _AC8102热处理基准审核标准【35】

 AS质量培训中心 2021-08-04

17.3.2 Thermal Treatment Step Two Age/PPT/Second Temper SECTION NA

17.3.2.1 Step Two Age/PPT/Second Temper

17.3.2.1.1 Furnace used:

17.3.2.1.2 Date part(s) processed:

17.3.2.2 Does the furnace possess the control and recording instrumentation required by the governing specification for this heat treatment? YES/NO

17.3.2.3 (EC) Step Two Age/PPT/Second Temper – Temperature



REQUIREMEN

T

SHOP PAPER

REQUIREMENT

SET

TEMPERATUR

E

ACTUAL

TEMPERATURES

Temperature


(EC)

(EC)

(EC)


Check if used






Control





(EC)

Recorder





(EC)

High/Low -

Type A or C

Instrumentation





(EC)

Load

Thermocouples





(EC)

17.3.3 (EC) Step Two Age/PPT/Second Temper – Time


REQUIREMENT

SHOP PAPER

REQUIREMENT

ACTUAL

Atmosphere

(EC)

(EC)

(EC)

Time and Tolerance

(EC)

(EC)

(EC)

Time loaded into

furnace




Time start of soak



(EC)

Time end of soak



(EC)

Media for Cooling

(EC)

(EC)

(EC)

Cooling Rate

(Excluding Quench)

(EC)

(EC)

(EC)

    本站是提供个人知识管理的网络存储空间,所有内容均由用户发布,不代表本站观点。请注意甄别内容中的联系方式、诱导购买等信息,谨防诈骗。如发现有害或侵权内容,请点击一键举报。
    转藏 分享 献花(0

    0条评论

    发表

    请遵守用户 评论公约

    类似文章 更多